How to reduce energy consumption in purification projects?
Home / News Center / Industry News / How to reduce energy consumption in purification projects?

How to reduce energy consumption in purification projects?

               
Update:2020-11-25 10:44:24
Summary:The energy consumption of the purification product is much greater than the energy consumption of ordinary workshops and office buildings. With the development of technology, various new product development and production will have higher requirement......

The energy consumption of the purification product is much greater than the energy consumption of ordinary workshops and office buildings. With the development of technology, various new product development and production will have higher requirements for cleanliness. Enterprises have brought more pressure, and construction companies are doing everything possible to update design schemes, develop new energy-saving equipment, and improve the level of construction management technology, so as to meet the higher requirements of customers.
1. Arrangement must be made rationally from the site selection and layout of the plant construction, which can fundamentally reduce investment and operation costs.
2. Reasonably choose the number of air changes in the purification project, which can effectively reduce the power consumption of the air supply, so as to achieve the effect of reducing the power consumption of the air supply.
3. The design plan should have a group face, comprehensively consider all aspects, so as to achieve reasonable use of energy consumption.
4. No partition filter and new air distribution device can constitute an energy-saving and flexible purification engineering system, so each purification unit should be arranged flexibly.
5. High energy costs often occur in the construction of purification projects, so we should try our best to reduce the BHP and air conditioning load of the fan. If possible, the load of the workshop shall not be under full load.
6. During the operation of the dust-free workshop, the maintenance and maintenance work shall be carried out in strict accordance with the management requirements of the workshop, so as to increase the use time of the equipment and at the same time reduce the cost and energy consumption of the enterprise.

 

Hollow Dismountable Seperation Wall System

Hollow Dismountable Seperation Wall System

Adopts environmental friendly material, no harmful......

Hand made hollow magnesium oxide panel

Hand made hollow magnesium oxide panel

Adopts good quality PCGI surface sheet with hollo......

Hand made PU panel

Hand made PU panel

Adopts good quality PCGI surface sheet with PU as......

Hand made PU panel

Hand made PU panel

Adopts good quality PCGI surface sheet with PU as......

Hand made hollow magnesium oxide panel

Hand made hollow magnesium oxide panel

Adopts good quality PCGI surface sheet with hollow......

Hand made paper honeycomb sand- wich panel with double layer magne-sium oxide boards

Hand made paper honeycomb sand- wich panel with double layer magne-sium oxide boards

Adopts good quality PCGI surface sheet with paper......

Machine made silicone rock sandwich panel

Machine made silicone rock sandwich panel

Adopts silicone rock as the core fller. Using G.I......

Medical HPL door

Medical HPL door

Our purification door has good out look, strong, ......

OT door

OT door

Our purification door has good out look, strong, ......

Aluminum frame single door

Aluminum frame single door

Our purification door has good out look, strong, ......